After-sales Service: | Champion |
---|---|
Warranty: | 12 months |
Type: | Sheet Extruder |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Champion Machinery---PMMA/PC Board Extrusion Line
GPPS/PC/PMMA Acrylic Plastic Sheet Board Machine Extrusion Production Line
This extrusion line is specially used to produce the PMMA sheet, which is as clear as glass and has high impact resistance. So it is also called plexi-glass and acrylic sheets. By changing the three rollers calendars, this line can also produce frosted sheets, embossed sheets and other sheets for different applications.
Model | MGL130/38, 45/30 | MGL120/35, 45/30 |
Material | PC/PMMA/PS/MS | PC/PMMA/PS/MS |
Width | 1200-2100mm | 12200mm |
Thickness | 1.5-12mm | 1-12mm |
Capacity | 750kg/h | 500kg/h |
CHAMPION, is committed to providing you extrusion machines with high quality, high efficiency, bigger capacity, lower power consumption. Have achieved success in international development and been recognized by customers as a leader in the sheet extrusion industry.
As a professional plastic sheet production line supplier, we have already successfully completed 1400+ projects. Such as PET/PLA/PP/PS/ABS/PE sheet extrusion machine, PC/PMMA/GPPS/MS sheet extrusion machine and EVA/PVC sheet production line.
* We are a leading manufacturer with 12 years' experience
* We have a complete and scientific quality management system
* Our quality can reach ISO and CE standard
1. How can I get the price of the sheet extrusion machine?
Please provide the details of your product requirement as clear as possible. So we can send you the offer at the first time. For designing or further discussion, it is better to contact us with E-mail, WhatsApp, Wechat or other instance ways, in case of any delays.
2. How can I get a sample to check your quality?
After price confirmation, you can require for sheet product samples to check our quality.
Free for the stock sample to check the design and quality, as long as you afford the express freight.
3. What about the lead time for mass production?
To be honest, it depends on the requirements of the specification. Generally 3-4 months.